Project Description

Client: States of Alderney Island for the newly constructed resevoir at the high point of the island

Requirements: Replace original 1960’s ‘Bruston’ set originally installed by G.C. Pillinger with an energy efficient and improved performance set to better serve the islands needs.

Fulfillment: Design, manufacture and install 3 x 7.5 kW Lowara SV4602 vertical multistage pumps with a fully wired form 4 compartmentalised panel mounted on steel skid for easy installation into the new pump house.