Project Description

Apartment Block Exterior

Client: LKF on behalf of St James Homes for a large housing development in Shepherds Bush.

Requirements: Design, manufacture and installation of an underground packaged plant room to supply potable water needs, irrigation to a ‘Living Wall’, pump sets for surface and foul water wet wells, fire sprinkler set and all associated controls.

Fulfilment: KGN Pillinger GRP (Underground Plant Room) housing 3 x 4 kW Lowara variable speed pumps for potable water, a Lowara ‘Hydraquench’ booster set for the fire sprinkler system, single 0.55 kW pump for supply of the irrigation system and KGN Pillinger submersible pumps for the wet well chambers. All controls for the numerous systems and an automatic mains electrical changeover panel to switch critical items in the event of a primary supply failure.